歡迎訪問濟(jì)南大悅金屬制品有限公司!
手機(jī):18866863726 孟總
網(wǎng)址:www.licoo.net
郵編:251400
地址:濟(jì)南市翡翠外灘南區(qū)
在H型鋼上邊開與立柱螺栓連接眼,便于與立柱連接。下邊焊接連接底板,底板上面開膨脹螺栓眼,便于用膨脹螺栓將貨架與地面連接。以固定貨架。Ji'nan cantilever shelf base is made of H steel or special profiles. H type steel is selected according to the requirements of the relevant provisions of the national standard steel. In the H type steel above the open and stud bolt connection, easy to connect with the column. The bottom plate is connected with the bottom plate, and the top of the bottom plate is provided with an expansion bolt hole, which is convenient for connecting the shelf and the ground with an expansion bolt. Fixed shelf.
1.采用方管制作。濟(jì)南懸臂式貨架 http://www.licoo.net/根據(jù)相應(yīng)的懸臂層載要求,先選定符合層載要求的方管,切割成需要尺寸,在一頭焊接防滑護(hù)板,另一頭焊接連接U型立柱連接件制作而成。Square tube production. Ji'nan, according to the corresponding layer of the cantilever rack cantilever load requirements, select the layer with load requirements of the pipe, cut into required size, welding antislip board in a head, a head welding connection type U column connections made.
2.采用C型鋼制作。濟(jì)南懸臂式貨架根據(jù)相應(yīng)的懸臂層載要求,先選定C型鋼的規(guī)格,選好后將兩片C型鋼對(duì)焊,焊接好后在一頭焊接防滑護(hù)板,另一頭焊接連接U型立柱連接件。Made of C steel. Ji'nan, according to the corresponding layer of the cantilever rack cantilever load requirements, select the specifications of the C steel, selected two pieces of C type steel butt welding, after a welding head skid plate, another head welding connection type U column connections.
3.濟(jì)南懸臂式貨架柱片與柱片之間采用連接桿連接,連接桿一般采用矩形管制作。為增加安全和穩(wěn)定性,在連接桿上加扁鐵背拉要專用拉子可將柱片緊緊固定。The connecting rod is connected between the cantilever shelf column and the column in Ji'nan. In order to increase the safety and stability of the connecting rod, the flat iron is pulled back to pull the column tightly.
所有濟(jì)南懸臂式貨架部件在生產(chǎn)完成后均為半成品,將經(jīng)最后一道工序噴塑。在噴塑前先進(jìn)行拋丸機(jī)拋丸除油、除銹,再進(jìn)行噴塑。完成后包裝發(fā)貨。All of the cantilever shelves in Ji'nan after the completion of the production of semi-finished products, will be the last process spray. Before the first shot blasting machine blasting oil, rust, and then sprayed. Packing and delivery after completion.